• +61 3 9629 3088

    Walhala Gold Mine

    Walhala Gold Mine

    DPS were required to design a structural hopper system to load the excavated material from the mining tunnel.

    The structure was designed to resist forces imparted from machinery load and connecting tramway structure.   Concrete footings and civil works were also designed for the project.

    The design encompassed the structural design of a hopper structure at the base of the Tramway including civil works, drainage, footing and design.   Design improvements resulted in substantial cost savings to the client and a significant reduction in construction time.