    The project at Longwood required the design of a new concrete bridge to replace an existing dilapidated timber and steel girder bridge. The new bridge has been designed to the current VicRoads standards and incorporated bored piles and concrete abutment that supported pre-stressed concrete planks. A bridge traffic barrier was also incorporated into the design.
    The project also required the design of an associated 5km crushed rock road and included a drainage design for stormwater runoff.
    All preliminary works including site survey and geotechnical testing were project managed by DPS. A Bill of Quantities for supply of materials and construction costs were also provided.