Drainage Dewatering Pipeline (1100m) and Pump Station

    Design of Drainage Dewatering Pipeline (1100m) and Pump Station

    This project involved the design of a new pump station and discharge pipe system. It was required due to planning operations within the mine. The project required a hydraulic analysis to determine the pump requirements for selection. The computer program adopted for the analysis was WATERCAD. DPS has a license for its operation. A preliminary pipe route was designed with which the pipe flows were modelled. The pipe route was designated to include all necessary fittings as required for its operation such as operational valves, pipe loops, pressure relief valves, non return valves and anchor restraints. DPS Pty Ltd procured all pipe materials by tender and organised the selection and delivering of the components. Our company also prepared contractual documentation for tender including drawings, technical specification and materials lists.